Ola Seweje
Delivery Problem Solving Proof
Real delivery problems, real solutions. Case studies from Newington Green, Old Street, Farringdon and beyond.
Contractor Safety Training as Operational Risk Prevention
I've trained 120+ contractors annually for 9 years. Here's what I learned about how training translates to operational risk reduction and cost stability. The relationship between contractor training and delivery outcomes is more direct than most delivery managers realise. Untrained teams don't just create safety risk. They create schedule risk, budget risk, and reputational risk. Structured training is the highest-leverage investment in operational risk prevention. Why Contra
Ola Seweje
6 days ago3 min read
When Projects Don't Have a Plan B: Managing Concurrent Risk Across Multiple Sites
Old Street and Farringdon were happening simultaneously. If Gas Networks delayed either site, both projects cascaded. We managed that without a Plan B. Instead, we managed the risk so effectively that Plan B was never needed. The concurrent delivery challenge on Old Street and Farringdon is the clearest example in my portfolio of portfolio-level risk management under constraint. Concurrent Site Risk Structure Two separate sites operating in parallel create a specific risk str
Ola Seweje
6 days ago3 min read
Multi Phase Delivery Under Stakeholder Pressure: The Newington Green Case Study
Delivering a four phase pedestrianisation scheme across 18 months with 73% public opposition requires more than project management. It requires stakeholder conversion strategy. The Newington Green programme didn't start with 73% opposition and end with a community that accepted the scheme reluctantly. It ended with an opposition rate of 41%, a functional pedestrianisation zone, and three follow-on project awards based on the delivery model. That's stakeholder conversion at sc
Ola Seweje
6 days ago3 min read
When Utilities Coordination Breaks: How We Prevented 8 Week Schedule Slippage
The Newington Green project almost slipped 8 weeks because Thames Water's sewer relocation timeline ran in parralel with our main delivery schedule instead of ahead of it. This is how we fixed it. The specific coordination failure that nearly cost the programme 8 weeks and £2.8M is a case study in why utilities coordination has to be treated as a first-order delivery problem, not a background task. The Problem: Standard Coordination Wasn't Working Thames Water had committed t
Ola Seweje
6 days ago3 min read
LTN Implementation at Scale: Converting Public Opposition to Public Support
LTN schemes start with neighbourhood opposition. Converting that opposition to public support within a delivery timeline is a specific skill that most project managers don't have. Low Traffic Neighbourhood schemes restructure how streets function in ways that directly affect residents' daily routines. The opposition they generate isn't irrational. It's predictable, specific, and manageable if you understand its structure. I've managed that conversion process on Newington Gree
Ola Seweje
6 days ago3 min read